CGK4-JAH-Jatiluhur

Winner

Model Data Center for New Digital Infrastructure in Yangtze River Delta Region 2021.

Location

The Jatiluhur site is startegically located and prepared to handle any distaster situation with.Ideal as a disaster recovery site,it is located in the flood free area and well connected to all public facilities.

  • 7.8 kms from train station 
  • 6.5 kms from toll road
  • 900 mts from the police station
  • 400 mts from hotel facilities near by
  • The site is also equipped with a helipad and large parking area.

Overview

No. of racks

44,700

ft2
Gross Area

5

MW

Critical Power*

PUE

Infrastructure
Facilities

Electrical
  • 4 MVA critical power supply
  • Dual power source to each rack with no single point of failure
  • 2N configuration UPS serving DRC-3 (4,600kVA)
  • N+1 configuration UPS serving DRC-1 and DRC-2 (1,320kVA)
  • N configuration UPS serving Network-DC (400kVA)
  • 40,000 liters fuel capacity serving DRC-1, DRC-2 and Network-DC; equivalent to 30 hours runtime at full load. 
  • 160,000 liters fuel capacity serving DRC-3; equivalent to 200 hours runtime at full load. 
  • 15 minutes battery autonomy 
  • N+1 diesel generator redundancy
  • 2 x 32A ceeform power sockets per rack
Mechanical
  • Dual power air cooled (DX Type) Cooling system
  • Up to 1.0 kW/m2 cooling density
  • 18°C -27°C temperature
  • 40% - 80% relative humidity
  • N + 1 CRAC configuration
  • Racks deployed in 8-tile hot or cold aisle
Certifications

ISO 9001

ISO 27001

ISO 14001

ISO 20000

UTI Tier III Facility 

PCI/DSS

TVRA

*Critical power subject to change.