Power Secured.AI Engineered.Proven in Delivery.

1.2GVA+ of secured grid capacity|High-density liquid-cooling capability|Accelerated conversion and greenfield delivery across APAC|Phased campus growth aligned to customer demand.

Regional footprint

Play Video

Proven AI Infrastructure Delivery

  • 7.1MW NVIDIA GB200 capacity delivered at CGK3/3A, Jakarta
  • 143 days from mobilization to Ready for Service (Phase 1 GB200 deployment)
  • 192kW per rack measured peak density at CGK3/3A
  • Up to 300kW per rack future design capability
  • Direct-to-chip liquid cooling supporting GB200-class and next-generation GPU architectures
  • Workloads live in the customer production environment

* Peak electrical load per rack under full processing conditions (EDPp1 measurement basis).

NVIDIA Certified Systems
ISO 27001      PCI DSS      Uptime Institute Tier III (Design & Facility)      ISO 14001      ISO 45001      TVRA      ANSI/TIA-942      BCA Green Mark Platinum
ISO 14001
BCA Green Mark Platinum
01

Power secured

1.2GVA+

Secured grid capacity across APAC.

02

AI engineered

300kW/rack

Indonesia's first H100, GB200 and liquid-cooled AI deployments.

03

Proven delivery

143 days

Mobilization to live GB200 workloads.

04

Operationally trusted

100%

Power and cooling uptime, 1H2026.

Delivered end-to-end via Speed-to-Power One platform accountable from grid connection to live workload.
Sovereign AI Infrastructure in Asia Pacific

Sovereign AI Infrastructure in Asia Pacific

August 27, 2026
The Shift from Generative AI to Agentic AI — and What It Means for APAC Infrastructure

The Shift from Generative AI to Agentic AI — and What It Means for APAC Infrastructure

August 22, 2026
CGK3/3A Case Study - Proven Speed-to-Power

CGK3/3A Case Study - Proven Speed-to-Power

July 11, 2026
How AI Factories Are Reshaping the Modern Data Center

How AI Factories Are Reshaping the Modern Data Center

June 5, 2026
BDx Secures Record 1.2 GW Power Deal with PLN for Indonesia's AI Infrastructure

BDx Secures Record 1.2 GW Power Deal with PLN for Indonesia's AI Infrastructure

June 3, 2026
BDx Secures US$320 Million Loan to Accelerate AI-Ready Data Center Infrastructure in Asia

BDx Secures US$320 Million Loan to Accelerate AI-Ready Data Center Infrastructure in Asia

April 1, 2026